Use the Job Log to view information about a job (Standard
Report procedure) sent to the WebFOCUS Reporting Server for execution.
The Job Log is an HTML page that opens in a browser window.
Viewing the Status of an Executed Job
The Job Log displays information about the activities
that occurred during the execution and distribution of a report.
It enables you to confirm that a report was executed and distributed
successfully. If a job does not conclude as expected, the Job Log states
the reason why.
The following image is a sample entry from a Job Log.
It includes the following:
-
Two-Way Email Job Description. The
name of the template associated with the job.
-
Server User. The
WebFOCUS Reporting Server user ID.
-
Managed Reporting User. The
Managed Reporting user ID.
-
Process. A
unique, system-generated key that identifies a specific execution
of the template.
-
Job Name. The
name of the Managed Reporting Standard Report procedure, preceded
by app and the delimiter /.
-
Start Time. The
date and time the job started running.
-
End Time. The
date and time the job finished running.
-
Messages. Details
on the activities that took place during job execution and distribution.
Procedure: How to View the Status of an Executed Job
-
Select Two-Way
Email on the Managed Reporting browser's blue toolbar
to access the Two-Way Email Administrator console. In the Developer
Studio Explorer, click the Two-Way Email Administrator
button in the toolbar.
-
Click
the Job Log button on the left to display the
Job Log Report information as shown in the following image.
-
Apply selection criteria to define
the information that will be retrieved:
- Use the drop-down lists for Start Date
and Start Time to specify the beginning of the time frame. Information
on all jobs run from that date and time up to the current date and
time will be retrieved.
- Enter the name of a specific Two-Way
Email template in the Job Description field. Information only for
the jobs associated with that template during the specified time
frame will be retrieved.
- Select Yes for
Last Executed. Information only for the most recently executed job
associated with the template (Job Description) during the specified
time frame will be retrieved.
-
Click Click
to View to display the Job Log report.
Because the Job Log accumulates information and can
become difficult to navigate, it is a good idea to periodically
purge it to conserve space.
You can control automatic purging of the Job Log at predefined
intervals of time. Edit the parameter LOG_PURGE_PERIOD in the schedule
section of the Distribution Server's bkrsched.cfg file.
For example, to automatically purge Job Log reports every two
days, enter:
LOG_PURGE_PERIOD 2
This parameter applies to the Two-Way Email Job Log and the ReportCaster
Job Log. For more information, see the ReportCaster Development and Administration manual.
Procedure: How to Purge the Job Log
-
Select Two-Way
Email on the Managed Reporting blue toolbar to access
the Two-Way Email Administrator console. In the Developer Studio
Explorer, click the Two-Way Email Administrator
button in the toolbar.
-
Click
the Job Log button on the left to display the
Job Log Report information as shown in the following image.
-
Using
the drop-down lists for Ending Date, specify a date through which the
Job Log will be purged.
-
Click Click
to Purge. Respond to the confirmation message on the
next dialog box. Two-Way Email will delete all reports from the
beginning of the Job Log through the specified ending date.